Privacy Policy.

Type anything to search

Balmoral

Overview

Balmoral Business Park

A new bespoke product specially engineered by COMBISAFE is playing a vital role in site safety at a new £6 million three-storey office block currently being constructed by the Robertson Group using a steel framing system in Aberdeen. 

Working with the main contractor, COMBISAFE was able to understand their needs and ensure the edge protection was designed into the steel frame structure.   Utilising a flange socket, a simple bespoke solution into which the 1800mm Adjustable Safety Posts could be installed, the edge protection could then be offset from the centre of the beam to avoid cross bracing.

‘The flange socket developed by Combisafe has proved to be an extremely quick system and enabled us to install the steel mesh barriers efficiently, saving more than a week in the decking process,’ commented Alistair Broadley, Project Manager at Robertson Eastern