Type anything to search

Westminster Bridge

Overview

Designed by AHMM architects and built by Balfour Beatty, 199 Westminster Bridge in central London is set to provide more than 1,000 student bedrooms along with a new school and office space.  Appointed to deliver the reinforced concrete frame, specialist contractor Masterson Holdings used 10 Safety Net Fan Maxis to cover the circumference of the building to protect public and workers below from any materials, tools or debris which may fall from the building.  

COMBISAFE also delivered a full height containment solution utilising proven, reliable and versatile Steel Mesh Barriers supplied with the specialist contractor’s branding, which offered an increased level of protection and containment against falling debris.

“We have rigorous safety policies and procedures and could not afford tools, materials or operatives falling over the leading edge” said Sean Frisby of Masterson Holdings. ”Combisafe provided us with a versatile and user friendly safety solution which met our specific requirements.”